Engineered Floor Systems for Coordinated Framing Projects
Coordinate floor layouts, component requirements, supplier review, and delivery planning around the available project documents and confirmed framing scope.
Available architectural and structural documents help establish the requested floor framing scope and layout information.
02 • COMPONENTS
System Requirements
I-joists, floor trusses, rim board, beams, blocking, openings, and related components are reviewed by project.
03 • DELIVERY
Jobsite Planning
Access, unloading, labeling, sequence, and delivery timing are addressed before confirmed shipment.
INFORMATION FOR REVIEW
What to Include With the Plans
1. Architectural Floor Plans
Dimensions, openings, stairs, shafts, bearing locations, and relevant elevations.
2. Structural Plans
Loads, beam requirements, details, schedules, and specified floor framing criteria.
3. Project Location
Address, access limitations, staging space, unloading conditions, and regional coverage.
4. Target Schedule
Requested review, production, and framing dates, subject to supplier confirmation.
Coordinate the Scope Before Production
Final design, engineering, pricing, production availability, and delivery timing remain subject to participating supplier review and written confirmation.